Case studies

Projects with numbers signed off by clients

Each case describes the starting point, what we did, and the measured result at the end. Filter by sector or search.

{n} case studies

Samples in a pharmaceutical laboratory
Labor PharmaEnergy & Utilities, Healthcare

Pharmaceutical company prepares for European sustainability directive

Decarbonization plan and first sustainability report in accordance with the CSRD directive.

-40%

of emissions by 2030

Read the case →
Operator in a metalworking factory
NortemetalManufacturing

28% more production without new machinery

A metalworking company from Águeda needed to meet more orders without investing in a second line. We reorganized the flow and maintenance with the teams.

+28%

production per shift

Read the case →
Classical facade of a banking building
Banco AtlânticoBanking & Insurance

Regional bank reduces operational costs by 21%

Efficiency program in back-office operations and the branch network, featuring process automation and a new structure.

-21%

in operational costs

Read the case →
Photovoltaic solar plant
LusenergiaEnergy & Utilities

12 MW solar plant delivered two months ahead of schedule

Project management and supervision of a photovoltaic plant in Alentejo, from licensing to grid connection.

-2 months

ahead of schedule

Read the case →
Hospital corridor with a healthcare professional
Hospital Santa ClaraHealthcare

Emergency room waiting times reduced by 35%

Redesign of the patient flow in the emergency department of a private hospital in Porto, featuring real-time data and new triage rules.

-35%

in waiting time

Read the case →
Store interior with product shelves
Casa VivaRetail & Consumer

Network of 60 stores with higher margins and less stock

New assortment, pricing, and replenishment policy for a home decor chain with stores in Portugal and Spain.

+3.2 p.p.

of gross margin

Read the case →
Historic building in Lisbon
Município de Vale VerdePublic Sector

City Council with 100% digital licensing

Dematerialization of urban licensing for a municipality of 80,000 inhabitants, with new procedures and a single platform.

9 days

instead of 47 for licensing

Read the case →
Logistics warehouse with pallets and shelving
Transportes RibeiroManufacturing, Retail & Consumer

Logistics center that ships double in the same area

Redesign of the warehouse and picking processes for an e-commerce logistics operator.

2x

orders shipped per day

Read the case →

No case studies match these filters.

Shall we talk about your next challenge?

An initial 45-minute, no-obligation conversation with one of our partners.

Energy saving tips

Once a month, no spam. You can unsubscribe at any time.